Search the Knowledge Centre

Found 595 Results

Project Delivery Manual

Previously a lack of planning resulted into too many changes during the delivery phases of projects. Quality of work, time and cost factors were ail affected and largely uncontrolled. Internally, the lack of integration and coordination resulted in conflicts. The increase in the volume and the complexity of projects compounded issues. Professionals could no longer … Continue reading "Project Delivery Manual"

April 16, 2008


Quality Assurance Applied To Grounds Maintenance

Once we had developed the framework for inspection, we undertook a series of staff consultations. At these meetings, staff provided important input into the tasks that should be inspected and the weighting factors to be used. This collaborative process was essential to the development of an effective inspection program. Staff input changed the proposed program … Continue reading "Quality Assurance Applied To Grounds Maintenance"

April 16, 2008


Central Receiving and Mail Services Track and Trace System

The WITS Track & Trace system was first initiated through collaborative meetings with Shipping & Receiving, Mail Services and Information Technology Services (ITS) staff to develop a better receiving process to record incoming shipments and log their final delivery location in order to reduce the frequency of misdirected/missing shipments. Once the staff realized how efficient … Continue reading "Central Receiving and Mail Services Track and Trace System"

April 16, 2008


Implementing FAST WebReq at UNBC

Millennium would periodically come to campus and meet with the clients to ensure their needs were met and the WebReq features could be customized for the campus. The stakeholder input resulted in a web-based application the users/department took ownership of and was designed to fit university requirements. A pilot group was then created to review … Continue reading "Implementing FAST WebReq at UNBC"

April 16, 2008


reSearcher software suite

Through the COPPUL and ELN library consortia, academic libraries and other stakeholders have been actively involved in the reSearcher project from the outset. The impetus for this project came from the realization that many Canadian academic libraries were facing the same challenges with respect to locating and managing information resources. The group agreed that by … Continue reading "reSearcher software suite"

April 16, 2008


UBC Ecotrek Project: Reducing energy consumption and improve/renew infrastructure through a cost recoverable mechanism

Over the last 3 years, there were more than 550 trades people involved in the construction of Ecotrek. Nearly, every person among the 43,000 faculty, staff and students on campus were affected by the retrofit. They looked at energy, at water, sewage, all the utility inputs and outputs of the university. They looked at personal … Continue reading "UBC Ecotrek Project: Reducing energy consumption and improve/renew infrastructure through a cost recoverable mechanism"

April 16, 2008


Laptop theft prevention program, utilizing the STOP – Security Tracking of Office Property

Thefts of electronic equipment and devices were highlighted in many public fora, ranging from student groups to governance. Combined with the theft of bicycles, these thefts are the most pervasive crime on campus and the most serious in terms of non-physical personal impact. Numerous Community and local media outlets reported the Stop program to the … Continue reading "Laptop theft prevention program, utilizing the STOP – Security Tracking of Office Property"

April 16, 2008


University public relations initiative for fire safety on campus

The kiosk theme was a collaborative effort involving University of Toronto Fire Prevention Staff, Toronto Fire Services, and the graphic design studio. The premise was to show partnership in safety and convey a campus environment where students can feel safe. Several preliminary draft ideas were circulated to different stakeholder offices on campus (Student Affairs, Health … Continue reading "University public relations initiative for fire safety on campus"

April 16, 2008


E-Recruitment at the University of Toronto

A project team with representatives from different parts of the University was established to choose the e-recruitment vendor. A larger group of individuals was then asked to test the system, act as advocates and become “super users”. We also developed a communication plan for the roll out of the system that involved information sessions, training … Continue reading "E-Recruitment at the University of Toronto"

April 16, 2008


Portal Partnership Links Windsor to International Online Solutions

Stakeholder involvement was an integral part of the planning and implementation of this large and complex project. In the fall of 2007 the project team consulted with deans and others in the eight Faculties and with four university-wide management groups (Administration Executive Group, President’s Executive Committee, Managers and Supervisors Group and the Senior Management Group). … Continue reading "Portal Partnership Links Windsor to International Online Solutions"

April 16, 2008


Page 51 of 60